Sunjoy D-GZ846PCO-AS-136 Guía de instalación Pagina 9

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 14
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 8
Fig.22: Attach Small Roof
Cover (Q), Finial (S) and Small
Roof Connector (M) together as
shown above.
Fig.20: Connect two Small Roof
Sheet (O) in order as shown in
above and insert the last Small
Roof Sheet into the slot of first
Small Roof Sheet.
Fig.21: Lock Small Roof
Sheet (O) to Small roof
crosspiece spot (K) by using
Bolt (DD) and Flat Washer
(BB).
Fig.24: Connect two Big Roof
Sheet (N) in order as shown
above. And insert the last Big
Roof Sheet into the slot of first
Big Roof Sheet.
Fig.25: Fix Big Roof Sheet (N) by
Cover Presser (P). Then lock
Cover Presser (P) with Decoration
Gutter (D) tightly by Screw (DD)
and Flat Washer (BB).
Fig.23: Insert one side of Big
Roof Sheet (N) under Big Roof
Frame(J).
Fig.26: Fix the gazebo on the groud by Stake (HH).
Fig.27: Insert one end of the Netting and Curtain Rods (U) which has snap hook hole into Netting
and Curtain Rods connecting 2 (T2), make sure it is insert totally. (The same way to insert Netting
and Curtain Rods connecting 3 (T3) with Netting and Curtain Rods (U).)
Fig.28: Counter pull the inserted Netting and Curtain Rods (U) to the snap hook fix area, then
make its another side insert into Netting and Curtain Rods connecting 1 (T1).
AA
Bolt M6X20
4PCS
BB
Flat Washer M6
12PCS
CC
Bolt M6X15
8PCS
DD
Bolt M6X15
5PCS
EE
Bolt M6X35
2PCS
FF
Bolt M6X55
1PCS
Back Up Hardware
Vista de pagina 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Comentarios a estos manuales

Sin comentarios